How it is made

Melt to
manifest.

Seven stages, one roof. From the heat number on a bar of stock to the stencil on a packed bundle, every step stays under our own control — and on our own certificate.

0stages, under one roof
0%non-destructive testing
3.1EN 10204 certificate per heat
1heat number, start to finish

The sequence

Walk the line,
stage by stage.

Pick a stage, or step through them in order. Each one shows what we record, what we hold to, and where the part stops until someone signs it off.

Raw bar stock and heat identification at goods inward
Stage 01 / 07

Stage 01

Heat approval

Mill certificates reviewed against the order specification; every heat number logged before cutting.

Recorded
Heat number, mill certificate
Control
Chemistry against the order
Hold point
PMI on receipt
The forging press in operation
Stage 02 / 07

Stage 02

Forming

Hot extrusion, cold drawing, pilgering or automated TIG welding, depending on the family and wall. Forged bodies are upset to near-net shape, so the grain follows the body rather than being cut across it.

Recorded
Route and heat, per batch
Control
Near-net shape, grain flow
Heat treatment and furnace control
Stage 03 / 07

Stage 03

Heat treatment

Solution annealing and bright annealing in pure hydrogen; quench rates recorded on chart.

Recorded
Quench rate, on chart
Control
Pure-hydrogen atmosphere
CNC turning to drawing tolerance
Stage 04 / 07

Stage 04

Straightening & sizing

Multi-roll straightening to tolerance, then cut, bevel and end-face on CNC. The first piece is gauged before the run, and every piece after it against the same setting.

Recorded
First-off gauge result
Control
Drawing tolerance
Hold point
First-off
Surface finishing and polishing
Stage 05 / 07

Stage 05

Pickling & finishing

Acid pickling, passivation, polishing to 180–600 grit, or electropolish on request.

Recorded
Finish, against the order
Control
180–600 grit or electropolish
Dimensional inspection in the quality lab
Stage 06 / 07

Stage 06

Non-destructive testing

Hydrostatic, eddy current, ultrasonic, dye penetrant and PMI — on 100% of production, not a sample.

Recorded
Inspection records
Control
100% of production
Hold point
Third-party inspection welcome
Marking, packing and despatch
Stage 07 / 07

Stage 07

Certification & despatch

EN 10204 3.1 certificate raised, stencilled and bundled into ISPM-15 heat-treated crates. The heat number and its certificate travel with the goods.

Recorded
EN 10204 3.1 certificate
Control
Sea-worthy, ISPM-15 crates
Hold point
Certificate

01 / 07

Served

Where our steel ends up.

The same seven stages feed every one of these. What changes is the grade, the testing the order calls for, and the paperwork that has to travel with it.

  • 01Chemical processingCorrosive and high-purity service
  • 02Oil & gasUpstream, wellhead and sour service
  • 03Power generationBoiler, condenser and instrument lines
  • 04PetrochemicalRefinery units and hydrocarbon containment
  • 05Mining & metalsAbrasive duty and hydraulic control
  • 06PharmaceuticalHygienic, electropolished and traceable
  • 07DesalinationSeawater and brine, duplex and super duplex
  • 08ShipbuildingMarine systems and offshore modules

Made to your order

From this process
to your line.

Send the drawing or the bill of materials as it stands. We will come back with the grade, the testing your order needs and a price against it.