Raw bar stock and heat identification at goods inward
01Heat approval
The forging press in operation
02Forming
Heat treatment and furnace control
03Heat treatment
CNC turning to drawing tolerance
04Straightening & sizing
Surface finishing and polishing
05Pickling & finishing
Dimensional inspection in the quality lab
06Non-destructive testing
Marking, packing and despatch
07Certification & despatch
  1. 01

    Heat approval

    Mill certificates reviewed against the order specification; every heat number logged before cutting.

  2. 02

    Forming

    Hot extrusion, cold drawing, pilgering or automated TIG welding, depending on the family and wall.

  3. 03

    Heat treatment

    Solution annealing and bright annealing in pure hydrogen; quench rates recorded on chart.

  4. 04

    Straightening & sizing

    Multi-roll straightening to tolerance, then cut, bevel and end-face on CNC.

  5. 05

    Pickling & finishing

    Acid pickling, passivation, polishing to 180–600 grit, or electropolish on request.

  6. 06

    Non-destructive testing

    Hydrostatic, eddy current, ultrasonic, dye penetrant and PMI — 100% of production.

  7. 07

    Certification & despatch

    EN 10204 3.1 certificate raised, stencilled, bundled and sea-worthy packed.

Served

Where our steel ends up.

  • 01Chemical & processReactors, columns, jacketed lines
  • 02Oil & gasUpstream, refinery, sour service
  • 03Power generationBoiler, superheater, condenser
  • 04PetrochemicalCracker, urea, fertiliser
  • 05Mining & metalsSlurry, leach, acid plant
  • 06Pharma & dairyHygienic, electropolished
  • 07DesalinationSeawater, MSF, RO skids
  • 08ShipbuildingMarine, ballast, exhaust

Made to your order

From this process
to your line.

Tell us the product, the grade and the documents you need against it. The route through the plant is then planned around your specification.